I Want to...

  • News
  • New salt and sand storage building at GWMC

    New salt and sand storage building at GWMC

    Posted: Friday October 11, 2024

    The new salt and sand storage building at Gord Watts Municipal Centre is nearing completion just in time for winter! The new building is 80 ft x 120 ft and over 30 ft high in the center, leaving room for up to 5000 tonnes of salt and sand for winter road maintenance.

    The floor of the building will be asphalt and is expected to be completed late next week. Then the massive 20 x 22ft door will be installed along with the electrical panel for powering the door opener and building lighting. This is great news for the preservation of our supply.

    Roads, Sidewalks, Traffic

     

    Enter your email and a link to reset your password will be sent to you.

    Sign up for an account

    *You will receive a verification code via email if you have not verified your email already.

    Enter the verification code that was sent to you.