Posted: Sunday March 21, 2021
Installing any type of sign requires a permit. Please review our Sign Bylaw for additional information.
Fascia or Pylon type signs
Required information includes:
- A Building Permit application. Click here to start your sign permit application through Cloudpermit
- application through Cloudpermit.
- An engineered drawing showing image and/or foundation information, size, sign location and materials used.
Temporary, Portable, Panel, or Banner Sign
Required information includes:
- Temporary/Portable/Panel/Banner Sign Permit Application. Click here to start your temporary or portable sign permit application through Cloudpermit
- permit application through Cloudpermit.
- The advertisement
- A site plan (the site plan must show the location of the sign, including measurements from property lines and entrances. Height of pole is required for banner signs).
A-board or Sandwich Board Sign
Required information includes:
- Temporary/Portable Sign Permit Application. Click here to start your sandwich board sign permit application through Cloudpermit.
- site plan
- image of sign
Once a permit has been issued for an A-board or Sandwich board sign that permit is good for the life of the sign.